New Forge Update Jan 13th 2013

Posted: January 13, 2013 in Uncategorized
Tags: , , , , ,

The pictures are a  little dark. We moved the light that was on the side of the building and it’s dark outside! The inside wall is down and the initial coating of stucco is on most of the inside and outside. I have decided to hire a guy to do most of the work since it is in my budget to do so. There are about two truck loads of material from the side of the building that needs to be removed and that should be accomplished today if we can get the trucks in. Well that’s about all there is. After this it is fitting the windows and doors and then getting electricity to it.

Taken 1-12-13 @ 1715

Taken 1-12-13 @ 1715

100_2434

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s